Power

ALGERIA - Alrar Power Plant

The Client: SONATRACH

Scope of work: engineering, procurement, installation & commissioning of a cycle power station

Contract awarded to the open consortium formed by Bonatti SpA and Carlo Gavazzi Impianti SpA

The plant is made up of three gas turbine generators rated 18 MW including the dedicated 66 kV gas-insulated substation.
The Alrar power plant serves both industrial and civil users, contributing to the development of the area.

Scope of work includes electrical, instrumentation & control systems, telecom and fire fighting packages.

ITALY - Combined Cycle Cogeneration Thermoelectric Power Plant at Italy factory in Augusta (Siracusa)

The Client: SASOL

Scope of Work: installation of Combined Cycle type Cogeneration Thermoelectric Power Plant (gas turbine, recovery boiler, steam turbine) of nominal capacity 40 MW.

Performance
The electricity will be used primarily by the factory, and the excess will be re-injected into the network by a modification to the existing plant substation already interconnected with the 150 kV national network.
The heat energy will supply the factory users in the form of steam bled from the heat cycle.
The Cogeneration Plant will be fed by natural gas, supplemented with other fuels available at the plant (process off-gas burnt in post-combustion). The project will be executed in 21 Months.

Photovoltaic Power Plants

Power Plants: 19
Total peak power: 27 MWp
Power Range:0,5 รท 4 MWp
Installation: ground
First Project: 1994