400/220/110 KV SUBSTATION OF TIRANA (TIRANA 2) - ALBANIA
 < BACK TO LIST

PROJECT:

CLIENT:

FINAL CLIENT:

SCOPE OF WORK:


CONTRACT:



AMOUNT:


PERIOD OF EXECUTION:


GAVAZZI SCOPE:

400/220/110 KV SUBSTATION OF TIRANA (TIRANA 2) - ALBANIA

APMU / MECE

OST

Engineering, procurement, civil works and installation/commissioning of the 400/220/110 kV substation

Acquired by the Temporary Consortium Association constituted by:
- ANSALDO T&D (Leader)
- CARLO GAVAZZI IMPIANTI SpA

Total Contract value Euro 24.629.000,00
Value of CGI’s share Euro 10.000.000,00

Coming into force: October 27, 2008
Completion date (scheduled): 2010

Engineering: Basic and detailed engineering

Engineering Tot. Hours
15.000

Procurement:
Main equipment
• No. 2 Autotransformer 300 MVA
• No. 2 Autotransformer 120 MVA
• No. 7 Circuit breakers 110 KV
• No. 22 Disconnecting switches 110 KV
• No. 20 Capacitive voltage Transformers
• No. 21 Current Transformers 110 Kv
• No. 18 Surge arresters 110 Kv
• No. 11 Circuit breakers 220 KV
• No. 34 Disconnecting switches 220 KV
• No. 26 Capacitive voltage Transformers
• No. 33 Current Transformers 220 Kv
• No. 30 Surge arresters 220 Kv
• No. 4 Line traps 220 Kv
• No. 5 Circuit breakers 400 KV
• No. 48 Disconnecting switches 400 KV
• No. 12 Capacitive voltage Transformers
• No. 15 Current Transformers 400 Kv
• No. 12 Surge arresters 400 Kv
• MV 20kV switchgear
• LV power center
• High voltage protection and control system
• Emergency generator
• DC system and UPS
• Auxiliary transformers

Value of the Supplies
20.325.000

Bulk material
• HV conductor, insulators and HV connectors
• Steel structures
• Power and control cables

Auxiliary system
• HVAC
• Lighting system and small power receptacles
• Grounding and lightning protection

Construction:
Civil works and electromechanical erection; Tests,
commissioning and start-up
Provisional operation

Construction Tot. Hours
120.000