Virgin Naphtha Nitrogen Extraction Plant, Gas Station - Candela (Italy)
- PROJECT
- Virgin Naphtha Nitrogen Extraction Plant, Gas Station - Candela (Italy)
- CLIENT
- ENI SpA - AGIP Division
- SCOPE OF WORK
- Electrical and instrumentation works for new nitrogen extraction plant
- CONTRACT
- EPC contract acquired by TECHINT S.p.A with:
- CARLO GAVAZZI IMPIANTI SpA as Nominated Sub-Contractor
- AMOUNT
- Total Contract Amount Euro 10.329.140,00
CARLO GAVAZZI share Euro 1.291.140,00
- PERIOD OF EXECUTION
- Coming into force: October 1998
Completion date: March 2004
- GAVAZZI SCOPE
- Engineering: Basic and detailed Instrumentation and electrical engineering
Procurement:
Main equipment
- Sheltered Control Room
- PLC control system
- Field instrumentation
- Control and On-Off Valves
- Electropneumatic local shut-down panels
- Sheltered Electrical MV/LV substation
- MV 6 kV cubicles
- MV/LV transformer, 1600 kVA
- LV Power Center and UPS system
Bulk material
- Earthing system
- Lighting and small power receptacles
- Instrumentation and electrical bulk materials
Auxiliary system
Construction:
Civil works related to electrical and instrumentation systems
Electrical and Instrumentation works
Field tests, precommissioning and commissioning
Assistance to start-up
Training