• Home

Omar Power Plant - Syria

PROJECT
Omar Power Plant - Syria
CLIENT
TPL - Tecnologie Progetti Lavori SpA of Rome
FINAL CLIENT
Al-Furat Petroleum Company - Syria
SCOPE OF WORK
OMAR Power Plant (Syria) 3x40MW. Gas Turbine Generator Units. Interconnection, distribution and control system of the electrical energy inside the area of gas extraction of EL ISBA, TANAK, OMAR, ELWARD and THAYYEM
CONTRACT
Sub-contract (back to back)
AMOUNT
Euro 17.500.000
PERIOD OF EXECUTION
Coming into force: December 1995
Completion date: December 1997
GAVAZZI SCOPE
Engineering: Basic and detailed engineering (hours 28.000)

Procurement:
Main equipment
  • No. 2 transformers 50 MVA 20/70kV
  • No. 3 elevator transformers 43 MVA 11/20kV and 11/21kV
  • No. 3 transformers 15 MVA 20/3,45kV
  • No. 1 transformer 7,5 MVA 20/3,45kV
  • No. 2 transformers 5 MVA 20/3,45kV
  • No. 3 transformers 1 MVA 21/0,4kV
  • No. 2 transformers 2 MVA 3,3/0,4kV
  • MV 3,3 kV and 20 kV panels
  • LV Power Center and MCC panels
  • Power units
  • Field instrumentation
  • Supervision system DCS and PMS
Bulk material
  • MV and LV, power, command and control cables
  • Bus-bar conduits
  • Lighting plants and FM sockets
  • Grounding system
Auxiliary system
  • Direct current systems
  • MV/LV protection systems
  • Low current system
Construction:
Works supervision
Tests, commissioning and start-up