Rabigh Desalination Plant

PROJECT
Rabigh Desalination Plant
CLIENT
SETE Technical Service SA (Developper of an Aramco's B.O.Y. Project)
SCOPE OF WORK
Electrical and instrumentation supplier for Rabigh Desalination Plant
CONTRACT
Direct
AMOUNT
1.500.000,00 €
PERIOD OF EXECUTION
Coming into force: July 2003
Completion date: October 2005
GAVAZZI SCOPE
Engineering: Electrical, instrumentation and process engineering (Basic and detail)

Procurement:
Main equipment
  • P.L.C. (Programmable Logic Controller)
  • Field Instrumentation
  • Transformers
  • Medium voltage switchgear
  • Low voltage switchgear
Bulk material
  • Power and instrumentation cables
  • Cable way
  • Lighting system
  • Grounding and lightning system
Auxiliary system
  • UPS system
  • Communication system
  • Fire fighting system
Construction:
Erection supervision
Tests and commissioning
Start-up