KJO Desalination Plant
- PROJECT
- KJO Desalination Plant
- CLIENT
- SETE Technical Service SA
- SCOPE OF WORK
- Electrical and instrumentation supplier for 1,5 MMGPD Desalination Plant
- CONTRACT
- Awarded to a Consortium formed by: Sete Technical Service Sa and Carlo Gavazzi Arabia (Carlo Gavazzi Impianti nominated subcontractor)
- AMOUNT
- Total contract amount: 36.516.370 USD
CGA + CGI share 10.938.130 USD
(CGI Euro 4.300.000)
- PERIOD OF EXECUTION
- Coming into force: November 2004
Completion date: March 2009
- GAVAZZI SCOPE
- Engineering: Electrical, instrumentation and process engineering (basic and detail)
Procurement:
Main equipment
- DCS System
- Field Instrumentation
- Field analyzers
- Transformers
- Medium voltage switchgear
- Low voltage switchgear
- UPS system
Bulk material
- Power and instrumentation cables
- Cable way accessories
- Piping, valves and fitting
Auxiliary system
Supervision:
Mechanical erection
Electrical and I&C erection
Tests, Commissioning and start-up activities