Expansion of Water and Treatment Facilities - Phase 2

PROJECT
Expansion of Water and Treatment Facilities - Phase 2
CLIENT
K.J.O. Al Khafji Joint Operation (Saudi Arabia)
SCOPE OF WORK
Turn key contract for a new Water Treatment Facilities
CONTRACT
Joint Venture (Sete - Carlo Gavazzi Impianti - Carlo Gavazzi Arabia)
AMOUNT
Total Contract amount 83,000,000.00 Saudi Rials
CARLO GAVAZZI IMPIANTI share 24,087,000.00 Saudi Rials
PERIOD OF EXECUTION
Coming into force: May 2002
Completion date: November 2004
GAVAZZI SCOPE
Engineering: Electrical, instrumentation and process engineering (Basic and detail)

Procurement:
Main equipment
  • D.C.S. (Distributed Control System)
  • Field Instrumentation
  • Transformers
  • Medium voltage switchgear
  • Low voltage switchgear
  • UPS system
Bulk material
  • Power and instrumentation cable
  • Cable way
Auxiliary system
  • Communication system
  • Fire fighting system
  • Lighting system
  • Grounding and lightning system
Construction:
Supervision, Erection, Tests, Commissioning and start-up