Al-Khafji Off-Shore Platforms (ex-neutral Zone Saudi Arabia - Kuwait)
- PROJECT
- Al-Khafji Off-Shore Platforms (ex-neutral Zone Saudi Arabia - Kuwait)
- CLIENT
- Aramco Gulf Operation Co. / Arabian Oil Company (Al-Khafji Joint Operations)
- SCOPE OF WORK
- Replacement of Off-Shore Electrical Equipment on 9 Existing Platforms
- CONTRACT
- Sub-Contract (back-to-back) from the Main Contractor BARRAK AL BARRAK & Sons Int’l. Cont. Co. ( Kuwait), to:
- CARLO GAVAZZI IMPIANTI SpA (Italy), for Engineering & Procurement§
- CARLO GAVAZZI ARABIA (S. Arabia), for Construction Works
- AMOUNT
- US$ 10,900,000
- PERIOD OF EXECUTION
- Coming into force: December 2000
Completion date: November 2002
- GAVAZZI SCOPE
- Engineering: Basic and detailed engineering
Procurement:
Main equipment
- Pressurized switchgear containers
- Steel structures for Decks extention
- 4,16 kV Switchgears
- 0,48 kV Switchgears
- Transformers 500 - 1000 kVA
Bulk material
- MV, LV, power, command and control cables
- Lighting plant and FM sockets
- Bulk materials
Auxiliary system
- Fire & Gas protection systems
- Navigation AIDS systems
Construction:
Plant Shut-Down schedule Off-Shore Electrical Hot & Cold Works ( organized on shift-work of 24 hours per day ), including:
- Disconnection, Removal or Relocation of existing equipment
- Installation and Connection of new equipment
- Termination and splicing of existing submarine cables
- Tie-in interconnections between the new and the existing equipment Field tests, precommissioning and commissioning