AL - Thurayaah 34.5/11 KV in Mubaraz Area - Al Assa
- PROJECT
- AL - Thurayaah 34.5/11 KV in Mubaraz Area - Al Assa
- CLIENT
- SCECO - SEC - ERB - (Saudi Arabia)
- SCOPE OF WORK
- Turn key project for N° 1 34.5/11 kV Substation
- CONTRACT
- Joint Venture between Carlo Gavazzi Impianti and Carlo Gavazzi Arabia
- AMOUNT
- Total Contract amount 16,600,000.00 Saudi Rials
CARLO GAVAZZI IMPIANTI share 9,605,000.00 Saudi Rials
- PERIOD OF EXECUTION
- Coming into force: January 2002
Completion date: October 2004
- GAVAZZI SCOPE
- Engineering: Civil, mechanical and electrical engineering (basic and detail)
Procurement:
Main equipment
- Power transformers 25 MVA
- 34.5 kV Medium voltage switchgear
- 11 kV Medium voltage switchgear including the protection system
Bulk material
- Medium and low voltage cable
- Grounding and lightning system
Auxiliary system
- 34.5 kV control and protection system
- Indoor and outdoor lighting system
Construction:
Civil and electrical up-grading of three 34.5 kV existing substation