Italiana Coke - Cogeneration Power Plant

PROJECT
Italiana Coke - Cogeneration Power Plant
CLIENT
Italiana Coke - Cairo Montenotte
SCOPE OF WORK
New cogeneration power plant operating with coke gas, constituted of No. 8 endothermic engines of 2,4 MVA and of a steam turbine of 1 MW
CONTRACT
Acquired by the Temporary Consortium Association constituted by:
  • INTERGEN / DEUTZ (Leader)
  • CARLO GAVAZZI IMPIANTI SpA
AMOUNT
Total of the contract Euro 16.526.620,00
CARLO GAVAZZI share Euro 6.197.482,00
PERIOD OF EXECUTION
Coming into force: June 1996
Completion date: February 1999
GAVAZZI SCOPE
Engineering: Basic and detailed engineering of the thermal cycle, of the electromechanical and instrumental plants and drive

Procurement:
Main equipment
  • Thermal cycle including boiler
  • Turbine of 1 MW
  • Substation 20/132kV
  • Elevator transformer 25 MVA
  • Unit transformers BT/MT
  • MV 20kV panels
  • LV Power Center and MCC panels
  • Automation and supervision plant with DCS
Bulk material
  • MV and LV, power, command and control cables
  • Grounding and lightning protection
Auxiliary system
  • Protection system
  • Lighting plants, FM sockets and low current systems
Construction:
Erection works
Commissioning and start-up
Training