New NATO Navy Harbour - Taranto (Italy)

PROJECT
New NATO Navy Harbour - Taranto (Italy)
CLIENT
Rizzani De Eccher - Taranto
SCOPE OF WORK
HV/MV Substation, 50-60 Hz frequency conversion station, MV and LV distribution
CONTRACT
Acquired by the Joint Venture constituted by:
  • ANSALDO SISTEMI INDUSTRIALI SpA
  • CARLO GAVAZZI IMPIANTI SpA
AMOUNT
Total of the Contract Euro 6.713.940,00
CARLO GAVAZZI share 50%
PERIOD OF EXECUTION
Coming into force: July 2004
Completion date: February 2007
GAVAZZI SCOPE
Engineering: Basic and detailed engineering

Procurement:
Main equipment
  • 132 kV equipment
  • HV / MV Transformers
  • MV Switchgear
  • LV Power Center and MCC panels
  • PLC Control and Automation systems
Bulk material
  • MV, LV, power, command and control cables
  • Lighting system and small power receptacles
  • Grounding and lightning protection
  • Bulk material
Auxiliary system
  • High and medium voltage protection system
  • D.C. system
Construction:
Installation and connection works
Tests, commissioning and start-up