New NATO Navy Harbour - Taranto (Italy)
- PROJECT
- New NATO Navy Harbour - Taranto (Italy)
- CLIENT
- Rizzani De Eccher - Taranto
- SCOPE OF WORK
- HV/MV Substation, 50-60 Hz frequency conversion station, MV and LV distribution
- CONTRACT
- Acquired by the Joint Venture constituted by:
- ANSALDO SISTEMI INDUSTRIALI SpA
- CARLO GAVAZZI IMPIANTI SpA
- AMOUNT
- Total of the Contract Euro 6.713.940,00
CARLO GAVAZZI share 50%
- PERIOD OF EXECUTION
- Coming into force: July 2004
Completion date: February 2007
- GAVAZZI SCOPE
- Engineering: Basic and detailed engineering
Procurement:
Main equipment
- 132 kV equipment
- HV / MV Transformers
- MV Switchgear
- LV Power Center and MCC panels
- PLC Control and Automation systems
Bulk material
- MV, LV, power, command and control cables
- Lighting system and small power receptacles
- Grounding and lightning protection
- Bulk material
Auxiliary system
- High and medium voltage protection system
- D.C. system
Construction:
Installation and connection works
Tests, commissioning and start-up