Power Station of Pont Ventoux - Susa (Italy)

PROJECT
Power Station of Pont Ventoux - Susa (Italy)
CLIENT
A E M Torino
SCOPE OF WORK
HVAC, Electrical and Control systems for the new hydroelectric power plant 2 x 85 MVA
CONTRACT
Awarded to a Temporary Consortium Association of companies constituted by: CARLO GAVAZZI IMPIANTI SpA (Leader), NUOVA MAGRINI GALILEO SpA
AMOUNT
Total of the contract Euro 14.226.000,00
CARLO GAVAZZI share Euro 12.680.000,00
PERIOD OF EXECUTION
Coming into force: August 2000
Final acceptance: 2008
GAVAZZI SCOPE
Engineering: Basic and detailed engineering

Engineering Tot. Hours
60.000

Procurement:
Main equipment
  • GIS substation 132 kV
  • No. 11 auxiliary transformers, various sizes
  • MV/LV Bus-bars
  • MV 15 kV and 6 kV switchgears
  • LV Power Center and MCC switchboards
  • High and medium voltage protection system
  • Emergency generator units, 200 kVA (n. 2), 500 kVA (n. 1), 2000 kVA (n. 1)
  • D.C. system and U.P.S.
  • Distributed Control System and supervisory package
Value of the Supplies
8.000.000

Bulk material
  • Cables 132 kV (No. 3 tern)
  • MV, LV, power, command and control cables
Auxiliary system
  • HVAC
  • Lighting system and small power receptacles
  • Telephone, interphone, TVCC plant, fire detection and fighting system, LAN for offices
  • Grounding and lightning protection
Construction:
Electrical and instrumentation works
Tests, commissioning and start-up
Provisional operation (one year)

Construction Tot. Hours
110.000