Power Station of Servola (TS)
- PROJECT
- Power Station of Servola (TS)
- CLIENT
- Elettra GLT SpA
- SCOPE OF WORK
- New cogeneration power plant combined cycle 145 plus 95 MVA realized at siderurgical factory of SERVOLA (TS)
- CONTRACT
- Acquired by the Temporary Consortium Association constituted by:
- ANSALDO ENERGIA SpA (Leader)
- CARLO GAVAZZI IMPIANTI SpA
- CARLO GAVAZZI COSTRUZIONI SpA
- MORAS COSTRUZIONI SpA
- AMOUNT
- Total of the contract Euro 120.318.965,00
CARLO GAVAZZI share Euro 18.075.000,00
- PERIOD OF EXECUTION
- Coming into force: August 1998
Completion date: December 2000
- GAVAZZI SCOPE
- Engineering: Process and basic engineering
Procurement:
Main equipment
- 150kV outdoor substation
- 1 step-up transformer 30MVA 11/150kV
- Auxiliary transformer
- MV and LV auxiliary switchgears
- Emergency diesel generators
- 2x10MW boilers for biomass fuel
- 2x10MW steam turbines and thermal cycle equipment
- 2 flue gas treatment filterse
- 2 air condenser
- DCS system
- All field instruments and local control panels
Bulk material
- Cables 132 kV (No. 3 tern)
- MV, LV, power, command and control cables
Auxiliary system
- Lighting plant and FM sockets
- Telephone, interphone, TVCC plant, watches, LAN for offices
- Cathodic protection plant
- Grounding and lightning protection
Construction:
Electrical and instrumentation works
Tests, commissioning and start-up