Biomass Power Plant of Bando d'Argenta (FE)
- PROJECT
- Biomass Power Plant of Bando d'Argenta (FE)
- CLIENT
- San Marco Bioenergie SpA
- SCOPE OF WORK
- 2x10MW steam turbine units and relevant wood chips boilers
- CONTRACT
- Turn-key type without civil works
- AMOUNT
- Euro 39.767.180,00
- PERIOD OF EXECUTION
- Coming into force: June 1999
Final acceptance: July 2004
- GAVAZZI SCOPE
- Engineering: Process and basic engineering
Detailed civil works and electromechanical engineering
Engineering Tot. Hours
110.000
Procurement:
Main equipment
- 150kV outdoor substation
- 1 step-up transformer 30MVA 11/150kV
- Auxiliary transformer
- MV and LV auxiliary switchgears
- Emergency diesel generators
- 2x10MW boilers for biomass fuel
- 2x10MW steam turbines and thermal cycle equipment
- 2 flue gas treatment filterse
- 2 air condenser
- DCS system
- All field instruments and local control panels
Value of the Supplies
26.000.000
Auxiliary system
- Boiler chemical dosing system
- Water treatment system
- Cooling water system
- Compressor air system
Construction:
Civil works
Electromechanical works
Tests, commissioning and start-up
Training of client personnel
Construction Tot. Hours
320.000