Biomass Power Plant of Bando d'Argenta (FE)

PROJECT
Biomass Power Plant of Bando d'Argenta (FE)
CLIENT
San Marco Bioenergie SpA
SCOPE OF WORK
2x10MW steam turbine units and relevant wood chips boilers
CONTRACT
Turn-key type without civil works
AMOUNT
Euro 39.767.180,00
PERIOD OF EXECUTION
Coming into force: June 1999
Final acceptance: July 2004
GAVAZZI SCOPE
Engineering: Process and basic engineering
Detailed civil works and electromechanical engineering

Engineering Tot. Hours
110.000

Procurement:
Main equipment
  • 150kV outdoor substation
  • 1 step-up transformer 30MVA 11/150kV
  • Auxiliary transformer
  • MV and LV auxiliary switchgears
  • Emergency diesel generators
  • 2x10MW boilers for biomass fuel
  • 2x10MW steam turbines and thermal cycle equipment
  • 2 flue gas treatment filterse
  • 2 air condenser
  • DCS system
  • All field instruments and local control panels
Value of the Supplies
26.000.000

Auxiliary system
  • Boiler chemical dosing system
  • Water treatment system
  • Cooling water system
  • Compressor air system
Construction:
Civil works
Electromechanical works
Tests, commissioning and start-up
Training of client personnel

Construction Tot. Hours
320.000