Biomass Power Plant of Crotone (KR)

PROJECT
Biomass Power Plant of Crotone (KR)
CLIENT
Biomasse Italia SpA
SCOPE OF WORK
2X10MW steam turbine units and relevant wood chips boilers including civil works and plant auxiliary systems
CONTRACT
Turn-key type including civil works
AMOUNT
Euro 37.102.679,00
PERIOD OF EXECUTION
Coming into force: December 1998
Completion date: June 2001 (PAC first unit)
October 2001 (PAC second unit)
GAVAZZI SCOPE
Engineering: Process and basic engineering
Detailed civil works and electromechanical engineering

Engineering Tot. Hours
100.000

Procurement:
Main equipment
  • 20kV substation
  • 2 step-up transformer 15MVA 11/20kV
  • Auxiliary transformer
  • MV and LV auxiliary switchgears
  • Emergency diesel generators
  • 2x10MW boilers for biomass fuel
  • 2x10MW steam turbines and thermal cycle equipment
  • 2 flue gas treatment filterse
  • 2 air condenser
  • DCS system
  • All field instruments and local control panels
Value of the Supplies
24.000.000

Auxiliary system
  • Boiler chemical dosing system
  • Water treatment system
  • Cooling water system
  • Compressor air system
Construction:
Civil works
Electromechanical works
Tests, commissioning and start-up
Training of client personnel

Construction Tot. Hours
320.000