Modernization of Steam Generation Plant Petkim Refinery of Aliaga (Turkey)
- PROJECT
- Modernization of Steam Generation Plant Petkim Refinery of Aliaga (Turkey)
- CLIENT
- Ansaldo Caldaie
- SCOPE OF WORK
- Electrical, Instrumentation & Control packages EPC
- CONTRACT
- Direct
- AMOUNT
- Euro 14.290.000,00
- PERIOD OF EXECUTION
- Coming into force: April 2005
Completion date: December 2008
- GAVAZZI SCOPE
- Engineering: Basic and detailed engineering
Engineering Tot. Hours
110.000
Procurement:
Main equipment
- New outdoor electrical substation 154Kv
- Black start Diesel 3,5MVA
- Step-up Transformer
- MV and LV transformers
- MV e LV switchgear
- PC e MCC cabinet
- Instruments for a new thermal cycle of Heat Recovery Steam Generation
- DCS,BMS and ESD System for four existing boiler and three steam turbine
- Control system for a new Boiler
- Water and steam analyzer
- Flue gas analyzer
Value of the Supplies
10.500.000
Bulk material
- HV cables
- MV and LV Power cables
- Instrument cables
Auxiliary system
Supervision:
Pre-commissioning
Commissioning
Start-up
Training
Supervision Tot. Hours
10.000