Power Generation Project for EL Feel Field (Libya)
- PROJECT
- Power Generation Project for EL Feel Field (Libya)
- CLIENT
- Bonatti SpA
- FINAL CLIENT
- ENI Oil
- SCOPE OF WORK
- Process, mechanical equipment, fire fighting system, layout and piping, steel structures, electrical, instrumentation and control, telecommunication system engineering activities; procurement and expediting activities (on behalf of Bonatti)
- CONTRACT
- Direct
- AMOUNT
- Euro 2.490.000,00
- PERIOD OF EXECUTION
- Coming into force: July 2007
Completion date (scheduled): 2010
- GAVAZZI SCOPE
- Engineering: Basic and detailed engineering
Engineering Tot. hours
53.000
Procurement:
Main equipment
- Storage tanks
- Pressure vessels
- Instrument air package
- Inert gas package
- Centrifugal pumps
- Emergency Diesel Generator 2.5 MVA
- DCS, ESD and F&G Systems
- Field instruments
- Valves
- Telecommunication system
- 132 kV connection (OHL + cables)
- Fire extinguishing system and fire&gas detection system
- Cathodic protection system
- Electrical heat tracing system
Value of the Supplies
13.000.000
Bulk material
- Piping and fittings
- Grounding system
- Power, control and instrumentation cables
- Cable trays and conduits
- Local stations and junction boxes