400/220/110/ KV Substation of Tirana (Tirana 2) - Albania
- PROJECT
- 400/220/110/ KV Substation of Tirana (Tirana 2) - Albania
- CLIENT
- APMU / MECE
- FINAL CLIENT
- OST
- SCOPE OF WORK
- Engineering, procurement, civil works and installation/commissioning of the 400/220/110 kV substation
- CONTRACT
- Acquired by the Temporary Consortium Association constituted by:
- ANSALDO T&D (Leader)
- CARLO GAVAZZI IMPIANTI SpA.
- AMOUNT
- Total Contract value Euro 24.629.000,00
Value of CGI’s share Euro 10.000.000,00
- PERIOD OF EXECUTION
- Coming into force: October 27, 2008
Completion date (scheduled): 2010
- GAVAZZI SCOPE
- Engineering: Basic and detailed engineering
Engineering Tot. Hours
15.000
Procurement:
Main equipment
- No. 2 Autotransformer 300 MVA
- No. 2 Autotransformer 120 MVA
- No. 7 Circuit breakers 110 KV
- No. 22 Disconnecting switches 110 KV
- No. 20 Capacitive voltage Transformers
- No. 21 Current Transformers 110 Kv
- No. 18 Surge arresters 110 Kv
- No. 11 Circuit breakers 220 KV
- No. 34 Disconnecting switches 220 KV
- No. 26 Capacitive voltage Transformers
- No. 33 Current Transformers 220 Kv
- No. 30 Surge arresters 220 Kv
- No. 4 Line traps 220 Kv
- No. 5 Circuit breakers 400 KV
- No. 48 Disconnecting switches 400 KV
- No. 12 Capacitive voltage Transformers
- No. 15 Current Transformers 400 Kv
- No. 12 Surge arresters 400 Kv
- MV 20kV switchgear
- LV power center
- High voltage protection and control system
- Emergency generator
- DC system and UPS
- Auxiliary transformers
Value of the Supplies
20.325.000
Bulk material
- HV conductor, insulators and HV connectors
- Steel structures
- Power and control cables
Auxiliary system
- HVAC
- Lighting system and small power receptacles
- Grounding and lightning protection
Construction:
Civil works and electromechanical erection; Tests, commissioning and start-up Provisional operation
Construction Tot. Hours
120.000