2x350 MW GAS/OIL Fired Units Thermal Power Plant El Tebbin (Egypt)

PROJECT
2x350 MW GAS/OIL Fired Units Thermal Power Plant El Tebbin (Egypt)
CLIENT
Ansaldo Caldaie
FINAL CLIENT
CEPC (Cairo Electricity Production Company)
SCOPE OF WORK
Engineering, procurement and construction of the electrical, instrumentation, automation and control works for 2x350 MW gas/oil fired unit boilers
CONTRACT
Nominated subcontractor
AMOUNT
Contract value Euro 7.240.000,00
PERIOD OF EXECUTION
Coming into force: May 2007
Completion date (scheduled): March 2010
GAVAZZI SCOPE
Engineering: Basic and detailed engineering

Engineering Tot. Hours
8.000

Procurement:
Main equipment
  • BMS / BPS system
  • CEMS
  • Vibration monitoring system
  • Fire fighting and detection system
  • Boiler and Field instrumentation
  • PLC sootblower system
  • MCC switchboards and distribution panels
Value of the Supplies
6.000.000

Bulk material
  • LV, power, I&C cables
Auxiliary system
  • MCC enclosure with HVAC
  • Lighting system and small power receptacles
  • Secondary grounding and lightning protection
Supervision:
Construction supervision assistance from CGImpianti

Supervision Tot. Hours
4.000

Construction:
Ansaldo Caldaie Egypt awarded the construction contract directly to Carlo Gavazzi Egypt for a total amount of 2.419.000,00