Open Cycle Gas Turbine Power Plant - Banias (Syria)
- PROJECT
- Open Cycle Gas Turbine Power Plant - Banias (Syria)
- CLIENT
- Turbocare SpA
- FINAL CLIENT
- PEEGT (Public Establishment of Electricity for Generation and Transmission)
- SCOPE OF WORK
- Engineering, procurement and installation/commissioning supervision of the electrical works related to no. 2 gas turbines and the extension of the 230 kV electrical substation
- CONTRACT
- Direct
- AMOUNT
- Contract value Euro 7.026.000
- PERIOD OF EXECUTION
- Coming into force: January 2008
Completion date (scheduled): 2010
- GAVAZZI SCOPE
- Engineering: Basic and detailed engineering
Procurement:
Main equipment
- Extension substation 230kV
- MV/LV Bus Bar
- MV 15kV switchgear
- LV power center and MCC switchboards
- High and medium voltage protection system
- Emergency generator 1000kVA
- DC system and UPS
- Auxiliary transformers
Bulk material
- Cable 230 kV
- LV, power, I&C cables
Auxiliary system
- HVAC
- Lighting system and small power receptacles
- Telephone system
- Grounding and lightning protection
Construction:
Construction supervision; Tests, commissioning and start-up Provisional operation (one year)