• Home

Photovoltaic Power Plant

PROJECT
Photovoltaic Power Plant
CLIENT
Terna SpA
SCOPE OF WORK
Lump sum turn key project for 4,416 MW Agrigento photovoltaic power plant
CONTRACT
Direct
AMOUNT
Contract value Euro 49.718.000
PERIOD OF EXECUTION
Coming into force: December 2009
Completion date (scheduled): December 2010
GAVAZZI SCOPE
Engineering: Basic and detailed engineering
Procurement:
Main equipment
  • Photovoltaic panels
  • Inverters
  • MV boards
  • MV/LV power transformer
  • LV Power Center and MCC panels
  • D.C. System and U.P.S.
  • Control and supervision system
  • Prefabricated electrical / control rooms
Bulk material
  • Steel structures, fences and gates
  • LV, power, command and control cables
  • Cable ways
Auxiliary system
  • Lighting system and small power receptacles
  • Grounding and lightning protection
Construction:
Civil works, mechanical works, electrical installation Tests, commissioning and start-up Operation (two years) Maintenance (two years)