Photovoltaic Power Plant
- PROJECT
- Photovoltaic Power Plant
- CLIENT
- Terna SpA
- SCOPE OF WORK
- Lump sum turn key project for 4,416 MW Agrigento photovoltaic power plant
- CONTRACT
- Direct
- AMOUNT
- Contract value Euro 49.718.000
- PERIOD OF EXECUTION
- Coming into force: December 2009
Completion date (scheduled): December 2010
- GAVAZZI SCOPE
- Engineering: Basic and detailed engineering
Procurement:
Main equipment
- Photovoltaic panels
- Inverters
- MV boards
- MV/LV power transformer
- LV Power Center and MCC panels
- D.C. System and U.P.S.
- Control and supervision system
- Prefabricated electrical / control rooms
Bulk material
- Steel structures, fences and gates
- LV, power, command and control cables
- Cable ways
Auxiliary system
- Lighting system and small power receptacles
- Grounding and lightning protection
Construction:
Civil works, mechanical works, electrical installation Tests, commissioning and start-up Operation (two years) Maintenance (two years)