ASM Metrobus Brescia
- PROJECT
- ASM Metrobus Brescia
- CLIENT
- Astaldi SpA
- SCOPE OF WORK
- Execution of Engineering Procurement and Construction (EPC) of the technological systems not specifically related to trains circulation of the new Metro Brescia
- CONTRACT
- EPC contract
- AMOUNT
- Total of the contract: Euro 16.600.000,00
- PERIOD OF EXECUTION
- Coming into force: March 2004
Completion date (scheduled): 2012
- GAVAZZI SCOPE
- Engineering: Basic and detailed engineering for mechanical, electrical and low current systems
Engineering: Tot. hours
38.000
Procurement:
Main equipment
- Chiller, ATU
- Ventilation system for tunnels and stations
- Power center and distribution panels
- Diesel generator
- UPS group
- LV main and secondary distribution
- Lighting and power supply distribution
- Grounding and lightning protection system
Values of the Supplies:
11.800.000
Auxiliary system
- Fire detection system
- Access control system
- Fire fighting system
- Plumbing system
Construction:
Erection of mechanical, fire fighting, electrical and auxiliary systems; Tests and start-up
Construction Tot. Hours:
200.000