"Garden City" High Prestige Building in Milan
- PROJECT
- "Garden City" High Prestige Building in Milan
- CLIENT
- Società Consortile di Vincenzo - Mangiavacchi
- SCOPE OF WORK
- Electrical, low current, mechanical systems
- CONTRACT
- Direct
- AMOUNT
- Euro 12.630.000
- PERIOD OF EXECUTION
- Coming into force: 2007
Completion date (scheduled): 2010
- GAVAZZI SCOPE
- Engineering: Mechanical, electrical and low current systems engineering
Engineering Tot. Hours:
7.000
Procurement:
Main equipment
- Chillers
- Air treatment units
- Pumps
- MV/LV transforming station
- Power centers and distribution panels
- Motor – generator set
- UPS groups
- LV main and secondary distribution
- Lighting and small power system
Values of the Supplies:
7.500.000
Auxiliary system
- Access control and security system
- TVCC system
- Fire detection system
- Fire fighting system
- Plumbing system
Construction:
Erection of mechanical, electrical and auxiliary systems; Water network; Fire fighting; Tests and start-up
Construction Tot. Hours:
100.000