Olefinic & Paraffinic Petrochemical Plants - Augusta (Italy)
- PROJECT
- Olefinic & Paraffinic Petrochemical Plants - Augusta (Italy)
- CLIENT
- Condea - Augusta (SR)
- SCOPE OF WORK
- Revamping of local instrumentation and control room for 6 production units
- CONTRACT
- Acquired by the Temporary Consortium Association constituted by:
- CARLO GAVAZZI COSTRUZIONI SpA (Leader)
- COMIN S.c.a.r.l.
- AMOUNT
- Total Contract Amount Euro 4.389.880,00
CARLO GAVAZZI share Euro 3.413.780,00
- PERIOD OF EXECUTION
- Coming into force: December 1998
Completion date: October 2000
- GAVAZZI SCOPE
- Engineering: Basic and detailed Instrumentation engineering
Procurement:
Main equipment
- Field instrumentation
- Compressor local panels
- Control Room distribution supply panel
- Control Room alarm cabinet
- Control Room auxiliary cabinet
Bulk material
- Instrumentation bulk materials
Construction:
Instrumentation works
Field tests and precommissioning