GAS Storage Station - Cortemaggiore (Italy)

PROJECT
GAS Storage Station - Cortemaggiore (Italy)
CLIENT
ENI SpA - AGIP Division
SCOPE OF WORK
Revamping of Gas Storage station and related Clusters
CONTRACT
EPC contract acquired by the Temporary Consortium Association constituted by:
  • ABB INDUSTRIA SpA (Leader)
  • CARLO GAVAZZI IMPIANTI SpA
AMOUNT
Total Contract Amount Euro 1.910.890,00
CARLO GAVAZZI share Euro 723.040,00.
PERIOD OF EXECUTION
Coming into force: November 1999
Completion date: September 2000
GAVAZZI SCOPE
Engineering: Instrumentation and mechanical detailed engineering

Procurement:
Main equipment
  • Distributed control system for station and 5 clusters
  • Barriers/ Interposing relays cabinets
  • Field instrumentation
  • Control and On-Off Valves
  • Hand valves and fittings up to 2”
  • Electropneumatic local panels
  • Fiber optic network between main station and clusters
Bulk material
  • Instrumentation and mechanical bulk materials
Construction:
Plant Shut-Down schedule Hot & Cold Works, including:
  • Disconnection, Removal or Relocation of existing equipment
  • Installation and Connection of new equipment/instrumentation in Control Room
  • Field instrumentation and connection to Control Room
  • Hot taps & Tie-in interconnections between the new and the existing piping
Field tests, precommissioning and commissioning